CONSTRUCTION OF SANITARY LANDFILL AREA IN CHIOS ISLAND
Owner:Prefecture of Chios
Budget:5.850.000
Time of construction:2010
Short Description: This project involved the design and construction of the following :
  • Sanitary Landfill area of 30.000 sq.metes, with a minimum capacity of 270.000m3
  • Network for collectin and burning bio-gas
  • Installations for collecting the drainage (Pump stations, tanks, and auxiliary equipment
  • Control/management building, entrace contol post, weighing facilities etc
  • Environmental restoration, planting, fire control zones, and flood prevention works
  • Monitoring installations to prevent polution