NEW ELEFSINA–KORINTHOS DOUBLE HIGH-SPEED RAILWAY LINE: ISTHMOS–KYRAS VRYSI SECTION (PREFECTURE OF KORINTHIA)
Owner: HELLENIC RAILWAY ORGANIZATION S.A. (ERGA OSE S.A.)
Budget: 18.048.423 €
Time of construction:1996 - 1998
Short Description:
  • Construction of High-Speed Railway Line, 3 km in length.
  • Loutraki railway line.
  • National Road section towards Loutraki.
  • Restoration of access roads on each side of the railway line.
  • Restoration of "Ioustinianos Wall".
  • Bridges with abutment openings between 4 m and 10 m.