| | CONSTRUCTION OF EARTHWORKS AND TECHNICAL WORKS FOR THE LINE CONNECTING N. IKONIO PORT TO THE RAILWAY NETWORK, FROM KILOMETRIC POSITION 0+000 TO KILOMETRIC POSITION 6+000 | Owner: | ERGA OSE S.A. | Budget: | 57.226.705 € | Time of construction: | 2001-2007 | Short Description: |
- Construction of the new railway line connecting N. Ikonio port to the rail network, 6 km in length.
- The project mainly involves the construction of Perama tunnel, 3.52 km in length, and the ventilation and evacuation tunnel, total length of 175 m.
- The tunnel inner surface above the rails level is 46.16 m2 with a maximum width of 7.8 m and a height of +6.80 m at the crown.
- Tunnel opening was done through limestone and brecciated calcareous grounds.
|
|
| |