CONSTRUCTION OF EARTHWORKS AND TECHNICAL WORKS FOR THE LINE CONNECTING N. IKONIO PORT TO THE RAILWAY NETWORK, FROM KILOMETRIC POSITION 0+000 TO KILOMETRIC POSITION 6+000
Owner: ERGA OSE S.A.
Budget: 57.226.705 €
Time of construction: 2001-2007
Short Description:
  • Construction of the new railway line connecting N. Ikonio port to the rail network, 6 km in length.
  • The project mainly involves the construction of Perama tunnel, 3.52 km in length, and the ventilation and evacuation tunnel, total length of 175 m.
  • The tunnel inner surface above the rails level is 46.16 m2 with a maximum width of 7.8 m and a height of +6.80 m at the crown.
  • Tunnel opening was done through limestone and brecciated calcareous grounds.