| | CONSTRUCTION OF EGNATIA ODOS HIGHWAY: ANILIO TUNNEL–AG. NIKOLAOS TUNNEL IN METSOVO DISTRICT (PREFECTURE OF IOANNINA) | Owner: | HELLENIC MINISTRY FOR THE ENVIRONMENT, PHYSICAL PLANNING & PUBLIC WORKS / EGNATIA ODOS S.A. | Budget: | 130.594.277,30 € | Time of construction: | 1999 – 2005 | Short Description: |
- Complete construction of twin tunnel (bidirectional) on either side of Metsovitikos River to enable Egnatia Odos Highway to cross the mountainous area around Katara.
- Ag. Nikolaos twin tunnel (total length of 2 x 350 m).
- Anilio twin tunnel (total length of 2 x 2.13 km).
- Complete construction of connecting road between Metsovo junction and the existing national road.
- Improvement of the road between Metsovo and Anilio (total length of 5.5 km).
- The project took place in an area of exceptional natural beauty. Therefore, project execution respected the landscape and made restoration in affected areas.
|
|
| |