CONSTRUCTION OF EARTHWORKS AND TECHNICAL WORKS FOR THE NEW DOUBLE RAILWAY LINE FROM AIGINIO RAILWAY STATION TO 473 KILOMETER
Owner: HELLENIC RAILROAD ORGANIZATION SA
Budget: 10.271.460 €
Time of construction: 01/03/1991 - 30/04/1994
Short Description:
  • Construction of a 4.1-km embankment (maximum height of 6 meters).
  • Soil improvement using geotextile and vertical drains of 20 meters in depth.
  • Bridge over the river of Aliakmonas (total length of 439 meters).
  • Pile foundations, 1.2 m in diameter and 60 m in depth.
  • 14 openings between abutments (30.5 m and 31.5 m).
  • Other technical works.