REHABILITREFURBISHMENT OF EXISTING ENOE–TITHOREA AND DOMOKOS–LARISSA DOUBLE RAILWAY LINE (PREFECTURE OF VIOTIA)
Owner:HELLENIC RAILWAY ORGANIZATION S.A. (ERGA OSE S.A.)
Budget: 22.743.947 €
Time of construction:1999 - 2002
Short Description:

Complete refurbishment of the existing double railway line, for 200-km/hr speed and 22.5-tones axle load (total length of 45 km).

The following railway works were executed:

  • Ultrasound checking of rails (Speno).
  • Dismantling of railway track.
  • Transfer and placement of ballast and dispersion of line materials.
  • Track laying.
  • Dismantling, assembly, welding and laying of existing turnouts.
  • Vertical and horizontal alignment of track and turnouts.
  • Rail welding.
  • Restoration of parallel road network (total length of 21.5 km