CONSTRUCTION OF RAINWATER AND WASTEWATER COLLECTION NETWORK AND WATER SUPPLY FOR THE CENTRAL AND NORTHERN SECTOR OF THE CITY OF LESVOS (MYTILENE) (DISTRICT III) |
Owner: | MUNICIPAL ENTERPRISE FOR WATER SUPPLY AND SEWAGE OF MYTILENE |
Budget: | 14.996.984 € |
Time of construction: | 1998 - 2001 |
Short Description: |
- Construction of wastewater sewer system for the Municipality of Mytilene (total length of 10.65 km).
- Construction of rainwater collection system (total length of 7.6 km).
- Restoration of asphalt pavement and side-walks in the city of Mytilene.
- Construction of pile walls for the protection of Lagadas stream mouth.
- The greatest part of the project was constructed in an archaeological site under the supervision of the local K’ EPKA (Ephorate of Prehistoric and Classical Antiquities) with a large number of archaeological finds.
|