CONSTRUCTION OF NEW ATHENS–THESSALONIKI DOUBLE RAILWAY LINE BETWEEN 310 AND 319 KILOMETER
Owner: HELLENIC RAILROAD ORGANIZATION SA
Budget: 31.694.791 €
Time of construction:1991 - 1994
Short Description:
  • Construction of a 4.5-km embankment.
  • Bridge design and construction over the river Enipeas (total length of 322 m).
  • Bridge pile foundations of 1.2 m in diameter and 40 m in depth.
  • Railway tunnel construction (total length of 1,100 meters, cross section of 100 m2).
  • Other road network rehabilitation technical works.