| | CONSTRUCTION OF EARTHWORKS AND TECHNICAL WORKS FOR THE NEW DOUBLE RAILWAY LINE FROM AIGINIO RAILWAY STATION TO 473 KILOMETER | Owner: | HELLENIC RAILROAD ORGANIZATION SA | Budget: | 10.271.460 € | Time of construction: | 01/03/1991 - 30/04/1994 | Short Description: |
- Construction of a 4.1-km embankment (maximum height of 6 meters).
- Soil improvement using geotextile and vertical drains of 20 meters in depth.
- Bridge over the river of Aliakmonas (total length of 439 meters).
- Pile foundations, 1.2 m in diameter and 60 m in depth.
- 14 openings between abutments (30.5 m and 31.5 m).
- Other technical works.
|
|
| |